The Effective Use of Space
Transforming industrial and commercial environments since 1982

Can cantilever racking be installed without relocating your stock?

Often, yes, but feasibility depends on the available space, stock location, access and installation requirements. We can assess these factors through a site survey, then provide written proposals and working drawings for a suitable installation approach.

Cantilever racking does not always require stock to leave the building. Installation can be planned around occupied areas, subject to access, space and safety requirements.

The main consideration is creating a suitable work zone without blocking essential warehouse movements. Existing stock may remain in other areas while installation progresses in agreed sections.

A site survey helps establish how this could work. We can review:

  • Available floor space and the proposed racking positions
  • Access routes for materials, installers and handling equipment
  • Stock locations, aisle access and loading requirements
  • Areas requiring temporary protection or restricted access
  • The sequence needed to maintain practical warehouse movements

Working drawings can show the proposed arrangement before installation begins. This gives you an opportunity to consider stock access, loading routes and operational constraints.

Where space allows, installation may be divided into separate phases. One area can be prepared while stock remains in another. The stock can then be moved between areas as each section becomes available.

This approach depends on the layout and the type of work involved. Some sites may require limited stock movement to create safe access. Others may need a larger clearance around the installation area.

We can discuss these requirements during a no-obligation consultation. Site meetings and surveys can be followed by written proposals and working drawings. Where required, project management can continue through installation and final commissioning.

Planning should also account for temporary changes to normal workflow. You may need to review picking routes, loading points, pedestrian movement and access to stored materials. Keeping these factors visible helps identify restrictions before work starts.

Cantilever racking should not be installed where stock, people or equipment could enter an unsafe work area. A defined separation between installation activity and warehouse operations may therefore be necessary.

If the existing layout leaves insufficient room for safe installation, relocating some stock may be unavoidable. The survey and drawings can identify this requirement before you commit to the proposed arrangement.

Any installation programme should be agreed against the site conditions and project scope. Quoted dates are estimates under Spartan Direct Limited’s terms, rather than guaranteed completion dates.

The practical answer is therefore site-specific. Cantilever racking may fit around existing stock, but the installation method must reflect the available space, access and workflow.

Cantilever racking beside stored long materials in a warehouse

Keeping stock on site does not mean every stored item stays in place. The installation footprint may need clearing, while the wider warehouse remains operational.

Before work begins, we can identify which stock must move temporarily and which areas remain available for picking, loading and handling. This separates necessary preparation from a full warehouse relocation.

Discuss Cantilever Racking Installation Around Your Stock

Arrange a no-obligation consultation to assess whether cantilever racking can be installed around your stock and operating requirements. A site survey can inform written proposals and working drawings for the proposed installation.