What should a coil racking quotation include?

A coil racking quotation should set out the proposed layout, coil loads, access requirements, materials, installation scope and compliance checks. It should also identify assumptions, exclusions, project stages and costs, so you can compare the proposal with site and workflow requirements.

A useful coil racking quotation should connect the proposed system to measured site conditions, coil characteristics and handling methods. It should show what we have allowed for, what remains your responsibility and how the stated price has been calculated.

Coil and load information

The quotation should record the coil details used for the design. These normally include coil weight, diameter, width, bore size, quantity and storage orientation. It should also identify the heaviest intended load and any changes expected in the stock profile.

Ask the supplier to state the design load for each storage position. Confirm whether the quoted capacity applies to every level or only selected positions. The proposal should explain any restrictions on mixed coil sizes or uneven loading.

Layout and access

The drawing should show the position of each rack, storage level, aisle and loading face. It should also indicate columns, doors, walls, plant, fire routes and other fixed obstructions recorded during the survey.

Access depends on how you handle coils. The quotation should identify the assumed forklift, crane, hoist or other handling equipment. It should allow for the equipment’s approach, turning space, lifting height and required clearance.

Check that the layout supports the movement sequence used at your site. A compact arrangement may restrict access if frequently handled coils sit behind less-used stock. The proposal should therefore distinguish storage density from practical retrieval.

Rack construction and protection

The specification should describe the rack components, support arrangement, finish and protective details. It should explain how the system supports the stated coil loads and prevents unintended movement during handling.

Where vehicles operate near the rack, ask whether barrier protection, end protection or workplace segregation forms part of the quotation. If these items are excluded, the document should say so clearly.

Any special storage requirement should appear in the written specification. This might include different support positions, coil separation, restricted loading zones or provision for future stock types.

Site and floor assumptions

A quotation should identify the site information behind the proposal. This includes available height, floor condition, access for delivery, installation constraints and the location of existing services.

Ask whether the quotation assumes a suitable floor for the imposed loads and fixings. If checks, repairs or structural advice remain outstanding, they should appear as assumptions rather than hidden within the price.

Our consultation may include a site meeting and survey, followed by written proposals and working drawings. Those documents give you a clearer basis for checking the arrangement before work begins.

Installation scope

The quotation should separate supply from installation. It should state what installation includes, such as unloading, positioning, fixing, assembly, protection and removal of installation waste.

It should also identify site requirements you must provide. These may include clear access, suitable storage for delivered materials, isolations, permits, welfare facilities or a designated working area. Do not assume these items form part of the quoted price.

Where several workplace changes are planned, project management may cover proposal and tender stages through installation and final commissioning. The quotation should state which stages are included and who coordinates other contractors.

Safety and inspection arrangements

Look for a clear description of safety checks connected with the installation. The quotation should identify any required checks of fixings, floor conditions, rack stability and protective equipment.

Ask whether commissioning records, loading notices and handover information are included. If racking inspections or aftercare are available separately, the quotation should show their scope and frequency rather than implying unlimited coverage.

The document should also explain how damaged components, altered layouts or changed loading will be dealt with after installation. Those changes can affect the original design basis.

Price, exclusions and project dates

A comparable quotation should itemise the main cost elements. These may include materials, delivery, installation, drawings, project management, inspections and any agreed additional work.

Check the treatment of access equipment, surveys, structural checks, floor preparation, permits, electrical work and making good. Each item should be included, excluded or marked as subject to confirmation.

The quotation should state its issue date, validity period and payment terms. Spartan Direct’s terms state that a quotation remains valid for 14 Business Days from issue. Confirm the applicable quotation before relying on that period.

Agreed dates should also be recorded, along with any conditions affecting them. Our terms state that we use all reasonable endeavours to meet agreed dates, but dates are estimates and time is not of the essence.

What to compare before accepting

  • Does the drawing match measured space and actual handling equipment?
  • Are coil weights, sizes and loading positions stated clearly?
  • Does the stated capacity cover the stock you expect to store?
  • Are barriers, segregation and other protection included where needed?
  • Are floor, access and installation assumptions written down?
  • Does the price separate included work from exclusions and provisional items?
  • Are inspection, commissioning and handover arrangements defined?
  • Are the quotation validity period and estimated dates clear?

We can use the survey, written proposal and working drawings to resolve these points before installation. That gives you a practical basis for comparing the quotation with site conditions, workflow and future storage requirements.

Coil racking drawing showing storage positions, aisles and loading access

Check the quotation against its drawing reference. The document should identify the drawing number, revision and date used for the price. This helps you confirm that the layout, coil positions and access arrangements have not changed between review stages.

Record any agreed amendments in writing before acceptance. A revised drawing should show the effect on storage positions, clearances, protection or installation work, so the quoted scope remains clear.