What we’ve been up to 2017

 

IMG_5061

This is a recent Installation for JLR ( Jaguar Land Rover) at their prestigious new site at i54. The mezzanine floor is designed to sit over an engine test cell and house all the mechanical and electrical equipment needed. The floor was Installed first and the cell was slid into place beneath the floor afterwards. We are currently in the process or designing phases 2 and 3. Space will be extremely tight as will be the time scale. It’s a challenge we relish.

 

 

 

IMG_4032 - Copy

IMG_0999 - Copy

Before and after, part way through the racking build on this full warehouse refurb for a garden tool supplier in Wigan.
 

IMG_5094

Last week we completed phase two of this project for a tile supplier in South Wales, we have closed down the racking aisles and added two extra runs following the decision to go to articulated forklifts. This has significantly increased the capacity of the warehouse without the need to take on additional premises.
 

 

 

 

 

 

 

2

5

Another Mezzanine floor installed. This one is for a specialist site safety equipment contractor in Oxford. Not a huge floor, but we have still increased the warehouse floor space by 50%.
 

IMG_5086
We have recently supplied 200 No new billet offcut trays for an Aerospace company in Birmingham to replace their old inferior trays.
They have been so pleased with the increased capacity that they will be having another 200!

 

 

 

 

 

January

IMG_5042
This week we have completed the Installation of a Heavy Duty Coil Storage system for coils weighing up to 5000kgs (10,000kgs per level).
There is a third level to go in as soon as the new forklift arrives. All Installed in two days for a very prominent steel distributor in Birmingham.
 

 

 

 
IMG_5034
Just supplied this access platform which fits around a couple of furnaces. Once the handrail is fitted it will enable the engineers to work quickly and safely when carrying out routine maintenance on the furnace. It looks like there is lots of space now, but once the second furnace is Installed and all the relevant plant and equipment you will struggle to see the platform at all!
 

 

 

IMG_5037
A New Cantilever Installation finished in Halesowen for a customer storing long lengths of Extruded Aluminium for the manufacture of window systems.
This will enable them to store a much bigger selection of products and save on a considerable amount of damage once its stored in the racks properly, not to mention the extra floor space they will gain back.
 

 

 

 
IMG_3861 - Copy
Completed first phase of main office refurbishment for a midlands steel company which included new changing and washroom facilities, locker room, ladies, gents & disabled toilets and kitchen areas.
 

 

 

 

 

IMG_4309 - Copy

IMG_4311 - Copy

Recently completed an industrial unit fit-out for a new Vape Retailer with production facility in Leicester.
The project involved building a retail outlet, new mezzanine floor, office fit-out and refurbishment of existing facilities.
 

 

 

 

 
IMG_1370 - Copy
Recently installed heavy duty pallet racking (3000kgs per level) for client in the aerospace industry. Very happy customer and they are already looking at extending the racking in the next few weeks!